micro-blog
Currently you in: HomeAbout usQuality witnessAuthorized lab tests

Authorized lab tests

leak detector
Adjustable rate calibration instrument
Motor integrated test system
 

Testing principle

Simulating the temperature and humidity of natural environment to test the performances of the unit, making sure the unit works well in various conditions. Theodoor heat pump water heaters make contributions to the energy-saving and safety for everyone.

Process control

Strict testing procedures are covering developing, testing and manufacturing. Quality control is implemented in each process.

Mainly tested parameter

COP, heating capacity, electricity consumption, water temperature

  • laboratory
  • manufacturing shop
Copyright (C) 2012 GZ Theodoor Tech Co., Ltd. all rights reserved    Guangdong ICP No. 05074175
Links